Nitro Pool Construction Progress

Aerial view of the Nitro pool site and surrounding buildings in May 2023

Nitro, West Virginia · January and May 2023

Two visits. A changing site.

UA-Visions photographed the Nitro pool construction site in January and May 2023. The selection pairs wider views of the site and surrounding streets with overhead photographs of the pool area, buildings, and ground work.

Aerial view of the Nitro pool site and surrounding buildings in May 2023
Coverage: Aerial construction photography.
Featured visits: January 27 and May 19, 2023.
Selection: Eight site photographs.

Construction progress gallery

Selected photographs from the January and May visits document visible site conditions at the time of capture. Select a photo to open the larger image.

Street-facing aerial view of earthworks at the Nitro pool site in January 2023
Oblique aerial view of excavation and building work at the Nitro pool site
Overhead view of the Nitro pool construction footprint in January 2023
Overhead view of the pool and building roofs during the May construction visit
Wide aerial view showing the pool site and adjoining streets in Nitro
Top-down photograph of the pool basin and circular paved area in May 2023
Closer aerial view of a building and ongoing ground work beside the pool
Skills

Posted on

October 15, 2026